Based in Deptford, London SE8

07468 280520
Bathroom renovation in London: precisely cut grey tiles around a shower floor drain

House renovation in Deptford,managed by one personfrom start to finish

Strip-out, plumbing, electrics, plastering, tiling, flooring and decorating, with building regulations and structural work handled too. Emanuele coordinates every trade, so you get a finished home without managing a dozen contractors yourself.

Get a Free Quote5.0 on Google · 20+ years' experience

Overview

House Renovation, explained

What it is

A house renovation brings several rooms, or a whole property, up to date in one coordinated project. It can include strip-out, structural alterations, new plumbing and electrics, plastering, new bathrooms and kitchens, flooring, tiling and decorating, along with the building regulations work that ties it together.

Who it's for

Homeowners who've bought a property that needs modernising, families reconfiguring a house to suit how they live now, landlords refurbishing between tenants, and owners of period homes in London and Surrey who want work done carefully.

When you need it

When several rooms need work at once, when you're moving walls or changing layouts, when old wiring or plumbing needs replacing throughout, or before moving into a newly bought property while it's empty.

Why it pays to use a specialist

Renovations go wrong in the gaps between trades: the electrician chasing walls after the plasterer has finished, the floor fitted before the heating is tested, nobody responsible for the overall sequence. Having one experienced person manage the order of works saves time, rework and money.

The cost of getting it wrong

What happens when this is left or rushed

Without proper coordination, renovations overrun, budgets stretch, and finished work gets damaged by the next trade in.

Work done twice

Trades working out of sequence means freshly plastered walls get chased again, and new floors get damaged by later work.

Projects that drag on

Gaps while you wait for the next trade to turn up add weeks, and every week living around a renovation is disruptive and costly.

Building regs problems

Structural and regulated work that isn't handled properly can cause trouble when you sell or remortgage.

Hidden faults left in place

Old wiring, failing pipework or damp found during strip-out gets covered up instead of fixed if nobody owns the whole picture.

Common mistakes we're called in to fix

  • Hiring trades separately and trying to coordinate them yourself around a full-time job.
  • Choosing finishes before deciding layout, structure and services.
  • Starting decoration before plumbing and electrics are tested.
  • Leaving building regulations and structural questions until the end.
  • Not allowing for what may be found once walls and floors are opened up.

Our process

Five clear steps, start to finish

  1. Step 1

    Visit & scope

    Emanuele walks the property with you, records what you want from each room and spots issues that affect the plan.

  2. Step 2

    Plan & quote

    We agree scope, sequence and finishes and give you a clear written quote, with staged payments tied to progress.

  3. Step 3

    Strip-out & structure

    Rooms are stripped back, and structural work and building regulations items are dealt with first.

  4. Step 4

    Services & surfaces

    Plumbing and electrics are installed with certificates where relevant, then plastering, tiling and flooring follow in order.

  5. Step 5

    Finish & handover

    Decoration, fit-out and a snag check together before handover.

What you get

The result you're paying for

One point of contact

Emanuele manages every trade on your project. One phone number, one person accountable.

The right order of works

Each trade arrives when the work before it is finished, so nothing is done twice.

Fewer surprises

Problems found during strip-out are discussed with you and dealt with, not hidden.

Specialist finishes by the founder

Tiling, marble, stone and wooden floors are Emanuele's own specialism, so the finishes match the quality of the planning.

Staged, fair payments

30% to book, 35% at halfway and 35% on completion.

Insured and well reviewed

£5 million public liability cover and a 5.0 Google rating.

In detail

Materials, methods and options for house renovation

What a full renovation can include

Typical whole-house projects combine strip-out, structural alterations such as opening up walls, rewiring and replumbing, plastering, new bathrooms and kitchens, flooring throughout, tiling and decoration.

We also handle the building regulations and structural side of the work, so the paperwork is in place when the project finishes.

Period properties and modern homes

Victorian and Edwardian homes in areas like Clapham, Dulwich, Fulham and Blackheath often hide uneven floors, old lath-and-plaster walls and dated services. They reward careful preparation before any finish goes on.

Newer homes and flats are usually more straightforward structurally, but often have building rules on working hours, noise and access that shape the schedule.

Living in or moving out

If you're living in the property, we can plan the work in phases so you keep a working kitchen or bathroom for as long as possible. If the property is empty, work runs faster and can be sequenced more efficiently.

We'll talk through both options at the quote stage so you can weigh cost, time and disruption.

Residential and commercial renovation

Most renovations we manage are homes, but the same approach of planning, sequencing and specialist finishes applies to commercial premises.

See our commercial refurbishment page for how we plan work around a business that needs to keep running.

What affects the cost of a house renovation

No two projects are priced the same, which is why we don't publish fixed prices. The main factors are the number of rooms involved, whether walls are being moved or removed, how much plumbing and electrical work is needed, the level of finish you choose for bathrooms, kitchens and floors, and whether the property is occupied during the works. The condition of what's already there matters too: a sound, flat surface is quicker to work on than one that needs repairing or rebuilding first.

The free quote visit is where these factors become clear. Emanuele will explain what's driving the price, flag anything that could change it once work starts, and give you a written quote so you can compare like for like. Payments are then staged at 30% to book, 35% at halfway and 35% on completion, so your money follows the progress you can see.

How we keep a renovation on track

The most common reason renovations overrun is that trades are booked in the wrong order or turn up before the previous stage is ready. We plan the sequence before anything starts: strip-out and structural work first, then first-fix plumbing and electrics, then plastering, then tiling and flooring, then second fix and decoration. Each stage is checked before the next trade begins.

When something unexpected appears, such as rotten joists, old wiring or hidden damp, you'll hear about it straight away with a clear explanation of the options. Decisions are made together, not quietly added to the bill at the end.

Where we work

We work across Central, West, South West and South East London, plus Surrey, including Mayfair, Kensington, Chelsea, Fulham, Richmond, Wimbledon, Clapham, Dulwich, Greenwich, Blackheath, Cobham and Esher. Popular areas for house renovation: Clapham, Dulwich, Fulham, Blackheath, Hammersmith, Cobham, Esher. See every area we cover.

Related services

Why Tilermate

Why London homeowners choose Tilermate for house renovation

Emanuele Campoccia trained as a tiler in Italy from a young age and has more than 20 years of experience. Since 2014 he has worked across London and Surrey on homes and commercial properties, and he still leads every project personally. When you call, you speak to the person responsible for the result, not a call centre or a salesperson.

Customers consistently mention the same things in their Google reviews: attention to detail, professionalism, clear communication and a clean, precise finish. Those reviews average 5.0, and several describe Emanuele checking not only his own work but that everything else on the project was done correctly.

The commercial side is kept simple. Quotes are free and written. Payments are staged at 30% to book, 35% at the halfway point and 35% on completion, so you're never paying far ahead of the work. Tilermate Interiors Ltd carries public liability insurance of up to £5 million, and bathroom installations come with a 2-year workmanship warranty from handover.

We work Monday to Saturday, 7am to 6pm, on planned projects only. That focus means each job gets proper preparation and attention rather than being squeezed in between emergency call-outs.

FAQ

House Renovation: your questions answered

How long does a house renovation take?

It depends entirely on the scope. Once we've agreed what's included, you'll get a realistic programme with your quote.

Do you handle building regulations and structural work?

Yes. Tilermate handles building regulations and structural work as part of renovation projects.

Can I stay in my home during the renovation?

Often yes, with the work phased room by room. Some projects are faster and less stressful if the property is empty, and we'll advise honestly.

Is there a warranty on house renovations?

Our 2-year workmanship warranty applies to bathroom installations. Any bathroom included in your renovation is covered by it.

Do you do house renovations in Surrey?

Yes, including Cobham, Esher, Oxshott, Weybridge and Virginia Water, as well as across London.

How much will my project cost?

Every project is priced individually after a free visit, because size, materials and the condition of the existing room change the cost. You get a clear written quote before any work starts, with no obligation.

How do payments work?

30% deposit to book your start date, 35% when the job is halfway, and the final 35% on completion. You are never asked to pay far ahead of the work that has been done.

Are you insured?

Yes. Tilermate Interiors Ltd carries public liability insurance of up to £5 million.

Do you offer emergency call-outs?

No. We focus on planned renovation and installation work, Monday to Saturday, 7am to 6pm. That focus is what lets us give each project proper attention.

Renovate your home without managing a dozen trades yourself

Book a free visit. Emanuele will walk the property with you and give you a clear plan and written quote.

£5m public liability · Staged payments · 5.0 on Google

07468 280520Free Quote